Previous Home Next
Day 31: The Tile is All Set!Wednesday, October 03, 2012
With Carrera dust piling up in all sorts of interesting places, the tiling of both the main floor and the shower floor were completed today (and on time with Graeson's estimate!):

As you can see, we are also having Graeson install Carrera baseboard, which is being made from cutting down 12x12-inch square half-bullnose tiles. It looks like we are just about ready to get the vanity installed so that we can bring out the marble slab vendors to size the pieces for the vanity top, shower threshold, and the benches!

Previous Home Next
blog comments powered by Disqus