Day 25: Tile Prep, Part IMonday, September 24, 2012
Today begins the next major phase of this projects as our "tile guy", Graeson, arrived on the job to start preparing the shower and floor for tile. He is using a system of products made by Schluter to provide a guaranteed waterproof barrier behind all of the tile, which adds some time and will give us peace of mind that we won't discover water built up in the ceiling of the first floor (as we did a number of months back!). Here you can see some of the vapor barrier on the back shower wall, as well as the leveled-out shower floor:

At the same time, Mike was here today to get the GFCI duplex outlets installed in the vanity area: